CHQ CIRCULAR
No.
R-III/Circular-11/2014
Dated 02-07-2014
To
All Circle Secretaries, CWC Members,
Divisional Secretaries and Branch
Secretaries.
Dear
Comrades,
As you know that the 30th All India Conference of AIRMS & MMS
Employees Union Group `C` was held at Tirupati from 15th to 18th
June, 2014 under the Presidentship of Com. S.K. Bardhan President, CHQ R-III.
Near about 1200 delegtes and visitors from different corners of the country
participated. All the circle Secretaries except H.P and and all CWC members
attended the Conference.
The Reception Committee has
made nice arrangements for boarding and lodging. CHQ congratulates and warm
greetings to the Reception Committee.
Com.
K.K.N. Kutty, President Confederation of C.G. Employees and Workers inaugurated
the Conference. Chairman Reception Committee
Sh Verma
delivered welcome speech. The Conference was addressed by Com. K.V. Sridharan
Ex G/S , Sh G.N. Reddy M.L.C. Tirupati , Com. G.O. State Secretary AITUC on 15th
June, 2014. Com. D.K. Rehate Ex President NFPE inaugurated the Subject
Committee on 16th June, 2014. Subject Committee was addressed by Coms. R.N. Prashar ASG, NFPE, Nageshwar
Rao G/S COC A.P., R. Seetha Lakshmi G/S P-IV, P.Suresh G/S R-IV, P.Panduranga
Rao G/S GDS (NFPE), P.Mohan G/S P.T.C.L., R.Shivnarayana, President P-III,
Nagabhushanam Working Chairman PTCL& Es C/S R-III A.P., and other leaders.
Com. C.C. Pillai EX S/G NFPE & G/S R-III Released video `CD` and delivered lecture on Com. K.Adinarayana death
anniversary on 17th June, 2014. More than 71 delegates including
Circle Secretaries and CWC members participated in the delebrations.
On
the basis of the delebrations, the 30th AIC adopted Resolutions which were published in the “RMS Worker”
July, 2014 issue and took the following decisions:-
CALL
ATTENTION DAY TO SAVE RMS & MMS
Phased
programme with dates and period:-
The
program will start from 1st week of July 2014 and will be
culminated 3rd week of august 2014
Branch level programme from 1week of the July 2014 to be
ended with in the 18th July 2014.
Badge wearing /group meeting /jata /public place meeting etc
highlighting the problems faced by the RMS & MMS Employees.
Divisional level programme starting from the 20th July,2014
to be ended the 30th July 2014.
One day long Dhrana at Divisional level with a proper attention
submitting a memorandum.
Addressed to CPMG /PMG through Divisional head for early settlement
of the problem faced by the staff .
Regional level program will start from the 2nd week
of August and to be ended with in 18th August 2014 by holding
Dharna/ Demonstrations.
Circler Level programme will be held on 22nd August, 2014
(Friday) holding day long Dharna at Circle Offices. .
All the leaders/ Circle Secretaries affiliated of NFPE may be
requested to attend the programme at Circle level
The date of program from Branch level to Regional PMG level may be
fixed up by the Circle Organisation intimating to the Central Headquarter
All the Circle Secretaries are requested to prepared their rank
and file to metalize the program in a serious manner.
CHARTER
OF DEMANDS/MEMORANDUM
- Request
the administration to provide required facilities for proper functioning
of works - good quality of computers, scanners, Printers, UPS in the Speed
Hubs, Parcel Hubs, CRCs etc to improve the efficiency and to minimize the
difficulties faces by the staffs.
- Stop
harassment to the official in the name of new norms introduced
unilaterally with CRCS and SPCC etc.
- Stop the move to dismantle the
MMS and out sourcing MMS Drivers. Fill up all the vacant post of Drivers,
Artisans, cleaners, AMM, Manager and Dy. Manager and other category of
staff in MMS.
- Demand timely repaired and
maintenance of RMS and MMS Building and request to provide the working
& hygienic atmosphere.
- Demand replacement of condemn
vehicles; sanction justified posts of Drivers, Artisans etc for smooth
functioning of mail movement.
- The all SPCC Hubs throughout the
country should be under the control of SSRM/SRM (under RMS Division) as
the SPCC is the part of RMS.
- All L2 offices should be
identified as intra circle Hubs (ICSH) to avoid back routing of articles.
- Bring all BPCS Speed posts
centres, logistic posts centres etc under RMS Dn. and to Post LSG, HSG –II
& HSG – I as In-charge considering the work load of the offices.
- Revise the wages of
Part-time/contingent employees & DRM. Stop outsourcing of the work
done by the Part time/Contingent and DRMs.
- Demand withdrawal of collective
responsibility for the loss & misspent of the articles and bags.
- Request to frame clear norms for
processing Speed Post/CRC/Parcel without any ambiguity and considering the
practical feasibility.
- R.P. Sorting should not be
merged with Parcel Shorting to avoid loss of revenue, Trace & Track
should be arrange separately in R.P. Shorting. Ignoring the volume, size
of parcels a good number of parcel are being booked causing trouble in
transhipment. Staffs are engaged with parcel work in particularly the lady
official facing hardship in dealing. Fix norms ins size, weights etc and
all essential part to be take care off.
- Demand for introduction of
scientific schedule in MMS stop the harassment of staff related with the
schedules particularly the drivers and Mail Guard Cadres.
- Demand for budgetary of
allotment of fund in medical heads, so that the claims for the treatment
can be settled. The scarcity of fund is a cause for which the sufferings
are increasing day by day.
- Supply of 40 Seated Railway
Bogies. It is a regular harassment on the part of our staff. It is
requested to take up the case at the appropriate label with the Railway
Authority so that the matter can be settle for smooth Mail movement one
end to others.
- Stop vindictive attitude by the
authority as various levels. Attitude of the authority towards the unions
antagonise the staff at all level. Some officers don’t follow the rules
and refused for holding formal meeting and informal meeting with the
service union. Punishment is being awarded to the representative of the
service and the staff on trade union activities. Urges for proper
instruction to correct the tendency and all kind of function to be ensure
at all level maintain the transparency as the Departmental rules.
- Stop abolition/ merger of
offices – violation of the agreement are occurred at various circle level
stop this process without any delay urges for open mind discussion before
taking final decision.
- – 20) These three agenda can be
adopted by the respective circles as per urgency of the organisation at
their circle level intimating to the central H.Q.
NATIONAL
SECRETATIATE MEETING OF CONFEDERATION:- National
Secretariat Meeting of Confederation will be held on 17th July, 2014
in New Delhi to discuss 7 CPC related issues and 15 Points Charter of Demands
and future course of action.
NFPE FEDERAL EXECUTIVE:-
Federal Executive Meeting of NFPE will be held on 21st August, 2014
at Ongole (AP) to discuss 7 CPC & related issues, 15 Point Charter of Demands of Confederation,
future course of action and Pending Postal Problems.
Yours
Comradely
(Girl Raj Singh)
General Secretary
P-IV CWC REPORT:- The Central Working Committee Meeting of AIPEU
Postman and Group `MTS` was held at
Nellore (AP) from 28th June, 2014 to 29th June, 2014
under the Presidentship of Com. V.K. Saha President CHQ.
SK
Humayun Ex President & C/S P-IV AP Circle delivered the Welcome speech and
welcomed all guests, CWC members with Momento.
Com. M. Krishnan S/G NFPE &
Confederation inaugurated the CWC on 28th June, 2014 at 11.00 AM and
elaborately spoke on Postman Cadre problems, Memorandum relating the issues Postman & MTS and common
memorandum of C.G.Emp. which will be submitted to the 7 CPC.
Coms. Giri Raj Singh G/S R-III
& President NFPE, , K.V. Sridharan Ex G/S P-III , R.Shiv Narayan President
P-III,Raghupati ASG NFPE, A.G. Pasupati Senior Leader, , P.Panduranga Rao G/S
GDS (NFPE), P.Mohan G/S Part Time Casual Labour, I.S Dabas Ex G/S P-IV,Milan
Bhattacharjee Ex President P-IV, Nilappa
Ex C/S P-IV Chandra Sekhar President P-III, R.Seetha Lakshmi G/S P-IV and other leaders addressed the CWC.